July 01 for us yoass
Can't wait to try my new equipment: Hugo SAL + Vega X (BH) + Rakza Z (FH)
Well, we can hope. The overall protocols haven't been formalised yet, a sport-specific chapter will have to be added once they have. That will have to be vetted and approved, nationally. There is
hope, but no certainty, that we'll reach this milestone at or closely after the 24th of june ("juno", for the nutters among us).
Once that is done, every single venue will have to interpret (and describe) the protocols in terms of measures, and that in turn will require sign-off from local authorities. We'll have less than week to get this done, ánd to realise the necessary changes.
Here's what I expect.
- An extensive reservation/registration system.
- With an enforced data retention limit (GDPR/AVG requirement).
- Larger courts, so less tables.
- Stretches of time between play sessions (to deal with aerosol by ventilation/depositation).
- Modification to ventilation systems.
- Diminished socializing, less "hang time", maybe no bar at all.
I think a week (or less) is rather ambitious. And all this absolutely requires we have no first wave flare-up, and I'm worried because there are (moderate) early warning signs that our current R0 is wavering.